Standard equipment installation construction quality acceptance
Author: Zhuo for air-conditioning purification Electromechanical Engineering Co., Ltd
Published:2017-09-18 16:05:35Views:2734【SML】
The adsorbent waste gas treatment equipment is suitable for selecting the appropriate adsorbent according to the physical and chemical properties of the object to be treated. Only the selected adsorbent has the necessary effective activity to achieve the desired treatment effect; in order to maintain the processing
Text label:
The
adsorbent waste gas treatment equipment is suitable for selecting the
appropriate adsorbent according to the physical and chemical properties
of the object to be treated. Only the selected adsorbent has the
necessary effective activity to achieve the desired treatment effect; in
order to maintain the processing capacity of the adsorption device, the
running cycle, It
is very important to distribute the internal airflow evenly. To this
end, it is necessary to install the main contents and quality acceptance
requirements of the adsorption-type exhaust gas treatment equipment,
including the allowable deviation of the equipment installation and the
effective activity of the adsorbent and the air tightness test Test pressure, time and acceptance of qualified to make provisions. In the "specification" also on the adsorption of waste gas treatment
equipment, adsorbent filling, the adsorption layer of the support layer
and allow the deviation of the general quality of the provisions of the
provisions of the provisions.
Exhaust
gas treatment equipment installation Construction quality acceptance of
the general requirements are: complete equipment on the body and
purification (adsorption) materials, accessories, all technical
documents. Some
of the exhaust gas treatment equipment is more complex, and even the
"system engineering", such equipment should also have the overall design
and installation instructions (including the necessary calculation of
information). These technical documents are both installed and run on the basis of the product also represents the quality of the content. For which the parties concerned should attach great importance. Chan. Exhaust
gas treatment equipment, or the complexity of the processing technology
of the different circumstances, not only in the equipment before the
installation of the box out of the inspection, acceptance, and do a good
job acceptance records, if necessary, should also be sent to the
equipment manufacturers to equipment factory Before the acceptance, the pre-factory acceptance of the contents and requirements should be clearly defined in the contract. Equipment handling, lifting, in place is the installation of equipment in the construction of an important part. Some of the waste gas treatment equipment in the dust-free workshop is
larger, structurally, or more complex, so in the "specification"
① should meet the relevant requirements of the product specification,
and do a good job protection work to prevent damage to equipment or
reduce processing performance;
② should be based on equipment size, weight, structural
characteristics, the development of safe, feasible handling, lifting
programs to ensure that personal, equipment and even the safety of
buildings;
In
order to ensure the normal use and safe production, in addition to the
pre-installation inspection equipment should be verified before the
equipment, but also check the weight of the equipment (be sure to take
into account the weight of the equipment, such as the installation of
the roof or the middle layer, Purification of the weight of the treated material) and the carrying capacity of the consistency. Is installed in the roof of the exhaust gas treatment device.